General Electric Offshore Wind Turbine Control Systems – Barcelona, Spain
Our work with General Electric involved the development of advanced control systems for offshore wind turbines. The images show some of our critical activities, including the integration of subsystems into the main turbine controller, ensuring communication reliability and system safety validation.
We were responsible for:
- On-site testing of turbine control systems.
- Implementing safety systems for turbine operations.
- High-level commissioning and performance verification.
These images showcase our engineers on-site, ensuring the turbines are prepared for robust operation and aligned with international safety standards.
Biothys Olfactive Silence – Madrid, Spain
We handled project documentation, PLC programming, and commissioning for odor control systems designed by Biothys. Our team was responsible for integrating the system into existing infrastructure and ensuring it met performance and safety standards.
This project involved both remote collaboration and on-site work to finalize commissioning, ensuring seamless operation.